Skip to main content
notice

EV Bldg. ENCS tower - Interruption ventilation general exhaust system April 8 from 5:30 am to 9 am

April 2, 2015
|
By Claudie Boujaklian


PLEASE BE ADVISED

A Planned  interruption of the ventilation general exhaust system  is scheduled for 2015-04-08, between the hours of 5h30am and 9am.

The following building will be affected:

●        EV building ( Engineering side 17 floors )

 General Information

●        Unbalance ventilation pressure in the building. 

●        Alarms on fume hoods, whistling exterior doors.

●        Whistling exterior doors.

●        Whistling laboratory doors.

●        Lower ventilation air change rate in laboratories.

 

Facilities Management

 




Back to top

© Concordia University