REVISED: GN Building: Sprinkler and fire prevention system interruption (M wing) - October 23, 2024 (07:00 -12:00)
To the users and occupants of the GN building,
A planned interruption of the sprinkler and fire prevention system (M wing) is SCHEDULED for Wednesday, 2024-10-23 between the hours of 07:00 and 12:00. This interruption is required to remove the ceiling of room M100 (project #23-024).
Building
- GN – Grey Nuns Building
General Information
- The service interruption will be confined to the M wing.
- Occupants and clients will not be affected by this interruption.
- Thermic detectors have already been installed prior to this interruption.
- During the interruption, no sprinkler will be operational in that wing from sub basement to roof level, there will be a fire watch by a security patrol.
- There will be no noise before 09:00am.
We thank you for your understanding.