Skip to main content
Headshot image

Osama Moselhi, PhD

  • Professor, Building, Civil, and Environmental Engineering

Contact information

Biography

Brief Bio 2021

Dr. Moselhi is Professor and Director of the Centre for Innovation in Construction and Infrastructure Engineering and Management (CICIEM), Department of Building, Civil and Environmental Engineering, Concordia University.  He served as Chair of the department and Executive Advisor to the Dean in graduate studies and research. He has over 40years of professional and academic experience. His industry experience spans tall buildings, bridges, nuclear power plants, harbor and offshore facilities.  He is a Fellow of the Association for Advancement in Cost Engineering (AACE International), the American Society of Civil Engineers (ASCE), the Canadian Society for Civil Engineering (CSCE),and of the Canadian Academy of Engineering (CAE). Dr. Moselhi supervised and co-supervised over 100 Masters and Ph.D. graduates, authored and co-authored over 400 scientific publications. He served as international consultant on academic affairs and on construction projects in Canada, USA and the Middle East. Dr. Moselhi is a recipient of numerous honours and awards, including the Walter Shanly Award of CSCE in recognition of “outstanding contributions to the development and practice of construction engineering in Canada” and the Tucker-Hasegawa Award of the International Association for Automation and Robotics in Construction (IAARC) in recognition of his “major and sustained contribution to the field of Automation and Robotics in Construction”.


View Osama Moselhi's CV

Teaching activities

Courses

  • ENGR 451 - Construction Engineering
  • EMAT 271 - Applied Probability and Statistics
  • ENGR 244 - Mechanics of Materials I
  • BLDG 492 - Construction Processes
  • BLDG 657 - Project Management
  • BLDG 680 - Construction Planning and Control I
  • BLDG 683 - Construction Processes
  • BLDG 781 - Project Acquisition and Control

Sample of supervised graduate students

  • Supervised and co-supervised to completion over 100Maters and PhD students

    Many of my former students have taken leadership positions in industry and in academia. In industry, for example, 2 are Vice Presidents (V.P.) at SNC-Laval in Montreal, V.P. International- Hydro Québec, V.P. Engineering and Construction, Aero Port de Montréal. In academia, as well, many of my former graduates hold faculty positions ranging from Assistant Professors to Full Professors at the University of Alberta, the University of Waterloo, and the University of Calgary in Canada, the University of Illinois Urbana Champaign, California State University Long Beach, the University of Wisconsin, California State University-Sacramento and     California Polytechnic State University-San Luis Obispo in the USA, and other universities in the Middle East and the Far East, including Cairo University, the American University in Cairo and Ain Shams University in Egypt, King Fahad University, Prince Mohammad Bin Fahd University and  Imam Abdulrahman Bin Faisal University, in KSA, the American University in Dubai in UAE, Sultan Qaboos University in Oman and King Mongkut's University of Technology Thonburi in Tailand. Below is a selected brief list of graduates.


    Yousifli, Z. (2021)” Development of a Multi-Agent System for Automated Resource Allocation in Maintenance of Hospital Buildings” PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisors:  O. Moselhi and F. Nasiri.  

    ELkabalawy,M. (2020) ”Optimized Resource-Constrained Method for Project Schedule Compression”, MASc Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi.

    Assad, A. (2020), “Resilience-driven Management of Water Distribution Networks”, PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi and T. Zayed.

    Golkhoo,F. (2020), “Material Management Framework based on Near Real-Time Monitoring of Construction Operations”, PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi.

    Golnaraghi,S. (2019). “Quantifying the Impact of Change Orders on Construction Labor Productivity using System Dynamics” , PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi and S. Alkass.

    Hussein,B. (2019), “An Evolutionary Stochastic Discrete Time-Cost Trade-Off Method for Repetitive and Non-Repetitive Construction Projects”, PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi.

    Salama, T. (2018), “Optimized Planning and Scheduling for Modular and Offsite Construction” PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi

    Ahmed, M. (2017), “Integrated NDE Methods Using Data Fusion For Bridge Condition Assessment” PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi, co-supervised with A. Bhowmick.

    Zangenehmadar, Z, (2016), “Asset Management Tools for Sustainable Water Distribution Networks”, PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi

    Ibrahim, M. (2015)Models for Efficient Automated Site Data Acquisition” PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi

    Salah, A. (2015)Fuzzy Set-based Risk Management for Construction Projects” PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi

    Youssef, A. (2015) “Asset Management Tools for Municipal Infrastructure Considering Interdependency and Vulnerability” PhD Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi

    Zorana(2014) “Multi-tiered Decision Support System for Selection of Project Delivery Systems for Capital Projects”, MASc Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor: O. Moselhi

    Montaser, A.(2013) “Automated Site Data Acquisition for Effective Project Control” Ph.D. Thesis, Department of Building, Civil and Environmental Engineering, Faculty of Engineering and Computer Science, Concordia University, Supervisor: O. Moselhi.

    Alzeriei, H. (2013) “Hybrid Simulation for Construction Operations”, PhD Thesis, Submitted, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi, co-supervised with T.Zayed

    Azarm, R. (2013) “Material Status Index for Tracking and Progress Reporting of Construction Projects”,M.A.Sc. Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi.

    Fahmy, M., (2009) "Integrated Multiple-Sensor Methodology for Condition Assessment of Water mains ", Ph.D. Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi.

    El-Omari, S.,  (2008) "Automated data Acquisition for Tracking and Control of Construction Projects", Ph.D. Thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Supervisor:  O. Moselhi.

    Leonard, C.A., (1988) "The Effects of Change Orders on Productivity", M.Eng Thesis, Centre for Building Studies, Concordia University, Supervisors: O. Moselhi and P. Fazio.

    Martinelli-Bello, A., (1986) "Bid Evaluation: A Multiattribute Utility Approach", M.Eng. Report, Centre for Building Studies, Concordia University, Supervisor:  O. Moselhi.


Research activities

Research interest

Automation in construction and in asset management of civil infrastructure.

(1)   Automation in construction

In this area we employ selection of digital imaging, 3D laser scanning, remotesensing, RFID, UWB, AI, spatial and web-enabling technologies as well as BIM, computersimulation and optimization methods for:

-       Automatedlocalization, detection and classification of resources on construction jobsites for monitoring, racking and progress reporting of construction operations,

-       Optimizedplanning and automated productivity assessment and tracking of largeearthmoving operations,

-       Quantitativemodeling of Change orders and weather impact on productivity,

-       Materialmanagement,

-       Decisionsupport systems for risk management, selection of most suitable projectdelivery method(s) and value engineering,

-       Optimizedplanning and scheduling for repetitive and no repetitive construction projects,considering uncertainty, resource allocation, and schedule compression needs.

 

(2) ((2) Optimized value driven assetmanagement for sustainable and resilient civil infrastructure

In this area we employ selected clusters of digital imaging, infrared,ground penetrating radar, 3D laser scanning, maintenance records, remote sensingtechnologies, GIS, GPS, AI including ANN and machine learning, web-enabling technologies,data fusion as well as optimization methods and computer simulation including discrete-event,agent-based  and system dynamics for:

-       Optimizedselection of risk-based and value-driven inspection strategies,

-       Automatednon-invasive and non-destructive condition assessment and rating, conditionmonitoring, detection and classification of defects,

-       Deteriorationmodeling and condition forecasting,

-       Resiliencemodeling and multi-attributed selection and optimization of recovery strategies,

-       Optimizedasset management to support targeted levels of service, sustainability and resilienceof civil infrastructure assets.


Publications

Publications

Authored and coauthored well over 400publications, including 190 in scientific journals. Below is a selected list ofpublications.

(Names of students and former studentssupervised by Prof. Moselhi are highlighted in bold)


Selected list of Journal papers

Elkabalay, M. andMoselhi, O. (2021), "Optimized Resource-Constrained Method for ProjectSchedule Compression", Engineering, Construction and ArchitecturalManagement, (Accepted Feb 19, 2021) https://doi.org/10.1108/ECAM-12-2020-1019.

Assad, A., Moselhi, O., and Zayed, T. (2021),“Resilience-Driven Sustainability-Based Rehabilitation Planning for WaterDistribution Networks”, ASCE, Journal of Construction Engineering and Management, (Accepted Feb17, 2021), Vol147, No 8,  https://doi.org/10.1061/(ASCE)CO.1943-7862.0002100

Valinejadshoubi, M.,Moselhi, O. and Bagchi, A. (2021),”Integrating BIM into Sensor-based Facilities ManagementOperations" Journal of Facilities Management, (Accepted November 30, 2020)

DOI:10.1108/JFM-08-2020-0055

Yousefi,Z., Nasiri, F., Moselhi, O. (2021) “Application of Multi-Agent Simulation forMaintenance Workflow Management and Resource Allocation in Hospital Buildings” Journalof Architectural Engineering (Accepted Nov 9, 2020), Vol 27, No. 2, 04021005, 2021 DOI:10.1108/ECAM-10-2019-0590

Valinejadshoubi, M.,Moselhi, O. and Bagchi, A.  (2020),” Development of anIoT and BIM-Based Automated Alert System for Thermal Comfort Monitoring inBuildings" Sustainable Cities and Society, (Accepted November 6,2020) DOI: 10.1016/j.scs.2020.102602

Arabpour M. and Moselhi, O. (2020) “Forecasting Project Duration Using Risk-BasedEarned Duration Management”, International Journal of Construction Management (AcceptedOctober 19, 2020).

DOI: 10.1080/15623599.2020.1840272

M. Abdelkader, E., Moselhi, O., Marzouk, M. and Zayed, T. (2021)"Hybrid Elman Neural Network and Invasive Weed Optimization Method forBridge Defects Recognition", Transportation Research Record

Journal of theTransportation Research Board, Vol 2675 issue: 3, pp. 167-199.

Zangenehmadar, Z., Moselhi, O., Golnaraghi, S., (2020)“Optimized planning of repair worksfor pipelines in water distribution networks using Genetic Algorithm” EngineeringReports,  (Accepted April 1, 2020).

Moselhi, O. and Arabpour M. (2020)“Risk quantification using fuzzy-based Monte Carlo simulation” Journal of Information Technology in Construction (ITcon),   February2020 at https://www.itcon.org/2020/5 DOI: 10.36680/j.itcon.2020.005.

Assad, A., Moselhi, O., and Zayed, T. (2019), “A NewMetric for Assessing Resilience of Water Distribution Networks”, Water 2019,11(8): 1701; https://doi.org/10.3390/w11081701

Golkhoo, F. Moselhi, O. (2019). “Optimized MaterialManagement in Construction using Multi-Layer Perceptron”, Canadian Journal ofCivil Engineering, Vol 46, No.10, pp. 909-923. 

https://0-doi-org.mercury.concordia.ca/10.1139/cjce-2018-0149 

Salama, T., Moselhi, O. (2019). “"Multi-ObjectiveOptimization for Repetitive Scheduling under Uncertainty" Engineering, Constructionand Architectural Management, Vol. 26, No.7: 1204-1320   https://doi.org/10.1108/ECAM-05-2018-0217.

Husein, B., Moselhi,O. (2019) “An Evolutionary StochasticDiscrete Time-cost Trade-off Method” Canadian Journal of Civil Engineering,  46: 581-600,https://doi.org/10.1139/cjce-2018-0352

Ahmed, M, Moselhi, O. Bhowmick, A. (2018),“Two-tier data fusion method for bridge condition assessment” Canadian Journalof Civil Engineering, Vol. 45, No. 3, pp. 197-214.

Moselhi, O., Ahmed, M.; Bhowmick, A. (2017) " Multisensor Data Fusion forBridge Condition Assessment”, ASCE, Journal of Performance of ConstructedFacilities, Vol. 31, No. 4: 0401700.

Moayeri, V., Moselhi, O., & Zhu, Z. (2017). DesignChange Management Using BIM-based Visualization Model. International Journal ofArchitecture, Engineering and Construction, 6(1): 1-11. Retrieved from:http://www.iasdm.org/journals/index.php/ijaec/article/viewFile/383/278

Moayeri, V., Moselhi, O., & Zhu, Z. (2017). BIM-basedModel for Quantifying the Design Change Time Ripple Effect. Canadian Journal ofCivil Engineering, Vol.44, pp. 626-642.

Moselhi, O., Bakry, I. and Alshibani, A. (2016),“Accelerating repetitive construction projects: with uncertainty andcontractors’ judgment”, Canadian Journal of Civil Engineering, Vol.43, No.11,pp. 949-957.

Alshibani, A. and Moselhi, O. (2016) “Productivity BasedMethod for Forecasting Cost and Time of Earthmoving Operations using SamplingGPS Data”, Journal of Information Technology in Construction (ITcon), Vol. 21,pp. 39-

Ibrahim, M. and Moselhi,O., (2016), “InertialMeasurement Unit Based Indoor Localization for Construction Applications”,Automation in Construction, Vol. 71, pp. 13-20.

Zangenehmadar, Z., Moselhi, O.,(2016) “Prioritizing deteriorationfactors in water pipelines using Delphi method”, J. Measurement,  Vol.90, pp. 491-499, DOI: 10.1016

Elsawah, H, Bakry, I., Moselhi, O., (2016), “Decision Support Modelfor Integrated Risk Assessment and Prioritization of Intervention Plans ofMunicipal Infrastructure” ASCE, Journal of Pipeline Systems - Engineering andPractice, Vol.7, No.4: 0401601, 10.1061/(ASCE)PS.1949-1204.0000245

Salah, A. and Moselhi, O. (2016), “Risk Identificationand Assessment for EPCM Projects Using Fuzzy Set Theory”,  Canadian Journal of Civil Engineering,Vol.43, No.5, pp. 429-442

Adhikari, R., Moselhi, O., Bagchi, A., Rahmatian, A.(2016), “Tracking of Defects in Reinforced Concrete Bridges using DigitalImages” ASCE, Computing in Civil Engineering, Vo.30, No. 5: 0401600, Permalink:http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000566 

Salah, A. and Moselhi, O. (2015) “Contingency ModelingUsing Fuzzy-Set Theory”, Engineering, Construction and ArchitecturalManagement, Vol. 22, No. 2, pp.214 – 241.

Montaser, A. and O. Moselhi (2014), “Truck for TrackingEarthmoving Operations” Journal of Information Technology in Construction(ITcon), Vol.19, pp.412-433.

Ibrahim, M. and Moselhi,O., (2014), "AutomatedProductivity Assessment of Earthmoving Operations", Journal of InformationTechnology in Construction (ITcon), Vol. 19, pp.169-184.

El-Sawah, H. and Moselhi, O., (2014)."ComparativeStudy in the Use of Artificial Neural Networks for Order of Magnitude CostEstimating in Construction", Journal of Information Technologies inConstruction (ITcon), Vol. 19, pp. 462-473.

Ibrahim, M. and Moselhi, O., (2014), "Wireless SensorConfigurations for Applications in Construction", Procedia Engineering,Vol. 85, pp. 260-273.

Adhikari, R.S., Moselhi, O., Bagchi, A., (2014), AutomatedCondition Assessment of Concrete Bridges with Digital Imaging, Smart Structuresand Systems, Special Issue on Robotics and Automation for Civil Infrastructure,Vol.13, No.6, pp.907-925.

Bakry, I., Moselhi, O. & Zayed, T. (2014)"Optimized Acceleration of Repetitive Construction Projects"Automation in Construction, Vol.39, pp. 145-151.

Montaser, A. and Moselhi, O. (2013), “RFID Indoor LocationIdentification for Construction Projects”, Automation in Construction, Vol. 39,pp. 167-179.

Adhikari, R.S., Moselhi, O., Bagchi, A., (2014), “Image-BasedRetrieval of Concrete Crack Properties for Bridge Inspection”, Automation inConstruction, Vol. 39, pp. 180-194., Available online 27 July 2013:http://dx.doi.org/10.1016/j.autcon.2013.06.011

Salman, A.; Moselhi, O. and Zayed, T. (2013). “SchedulingModel for Rehabilitation of Distribution Networks using MINLP”. ASCE, Journalof Construction Engineering and Management, Vol. 139, No.5, pp.498-509.

El-Omari, S. and Moselhi, O. (2011) “Integrating AutomatedData Acquisition Technologies for Progress Reporting of Construction Projects”,Automation in Construction, Vol.20, pp.699-705.

Fahmy, M. and Moselhi, O. (2010) “Automated Detectionand Location of Leaks in Water Mains”, ASCE, Journal of Performance ofConstructed Facilities, Vol. 24, No. 3, pp. 242-248.

Shehab, T., Moselhi, O. and Nasr, E. (2009),“Barcode-Assisted System for Document Management of Construction Projects”,International Journal of Construction Education and Research, Vol. 5, pp.45-60.

El-Omari, S. and Moselhi, O. (2008) “Integrating 3D LaserScanning and Photogrammetry for Progress Measurement of Construction Work”,Automation in Construction, 18(1), pp.1-9.

Moselhi, O., and Alshibani, A. (2007) “Crew Optimization In Planning and Control ofEarthmoving Operations Using Spatial Technologies”, Journal of InformationTechnology in Construction, Vol.12, pp 121-137.

Li, J., Moselhi, O. and Alkass, S. (2006) “ForecastingProject Status using Fuzzy Logic”, ASCE, Journal of Construction Engineeringand Management, Vol.132 , No.11 , pp 1193-1202.

Moselhi, O.,Assem, I. and El-Rayes, K., (2005) “Change Orders Impact on LaborProductivity", ASCE, Journal of Construction Engineering and Management,Vol. 131, No. 3, pp.354-359.

Moselhi, O., Gong, D. and El-Rayes, K., (1997) "Estimating Weather Impacton the Duration of Construction Activities", Canadian Journal of CivilEngineering, Vol. 24, No. 3, pp. 359-366.

Lorterapong, P. and Moselhi, O.,  (1996) "Project-network Analysis using Fuzzy Set Theory", Journal ofConstruction Engineering and Management, ASCE, Vol. 122, No. 4, pp. 308-318.

Hegazy, T. and Moselhi, O.,  (1994) "An Analogy-Based Solution to the Markup Estimation Problem",Journal of Computing in Civil Engineering, ASCE, Vol. 8, No. 1, pp. 72-87.

Alkass, S., Aronian, A. and Moselhi, O., (1993)"Computer Aided Equipment Selection for Transporting and PlacingConcrete", Journal of Construction Engineering and Management, ASCE, Vol.119, No. 3, pp. 445-465.

Moselhi, O., (1993) "Schedule CompressionUsing the Direct Stiffness Method", Canadian Journal of Civil Engineering,Vol. 20, No. 1, pp. 65-72.

Moselhi, O. and Deb, C., (1993) "ProjectSelection Considering Risk", Construction Management and Economics, Vol.11, No. 1, pp. 45-52.

Moselhi, O. and Loterapong, P., (1993) "Least Impact Algorithm for ResourceAllocation", Canadian Journal of Civil Engineering, Vol. 20, No. 2, pp.180-188.

Moselhi, O., Fazio, P. and Hason, S., (1992) "Automation of Concrete Floor Slab on GradeConstruction", Journal of Construction Engineering and Management, ASCE,Vol. 118, No. 4, pp. 731-748.

Moselhi, O., Leonard, C. and Fazio, P., (1991)  "Change Order'sImpact on Construction Productivity", Canadian Journal of CivilEngineering, Vol. 18, No. 4, pp. 484-492.

Moselhi, O. and Nicholas, M., (1989) "Hybrid Expert System for ConstructionPlanning and Scheduling", Journal of Construction Engineering andManagement, ASCE, Vol. 116, No. 2, pp. 221-238.

Moselhi, O. and Hason, S., (1989) "Robotics in Construction:  Implementation and Economic Evaluation",Canadian Journal of Civil Engineering, Vol. 16, No. 5, pp. 678-683.

Moselhi, O., (1988)  "Post ConstructionPerformance of a 4.6 km Breakwater", Journal of Performance of ConstructedFacilities, ASCE, Vol. 2, No. 3, pp. 159-169.

Moselhi, O. and Nicholas, M., (1988) “Expert System Tools for Construction Planningand Control", Microcomputers in Civil Engineering Journal, Vol. 3, No. 1,pp. 75-80.

Mamet, J.C. and Moselhi, O., (1985) “Outline ofCurrent Analysis Procedures for CANDU 600 MW Reactor Buildings", CanadianJournal of Civil Engineering, Vol. 12, No. 4, pp. 796-804.

Ha, H.K., Fazio, P. and Moselhi, O.,  (1978) "Orthotropic Membrane Analog for Tall Building Analysis",Journal of the Structural Division, ASCE, Vol. 104, No. 9, pp. 1495-1505.

Moselhi, O., Fazio, P. and Zielinski, Z.,  (1978) "Simplified Analysis of Wall-Frame Structures", CanadianJournal of Civil Engineering, Vol. 5, No. 2, pp. 262-273, (Awarded the GzowskiMedal of the CSCE).


Selected list of conference papers

Shamsollahia, D., Moselhi, O. and Khorasani, K.(2021)”ATimely Object Recognition Method for Construction using the Mask R-CNNArchitecture”, Proceedings of the 38th International Symposium on Automationand Robotics in Construction (ISARC 2021), Dubai, UAE.

Moselhi, O. (2021)“Digital transformation in construction”, keynote lecture, 3rd InternationalConference on Sustainable Construction and Project Management (ICSCPM2021),Cairo, Egypt.

Montaser, A. and Moselhi, O. (2021) “BIM IntegratedSite Data Acquisition Model for Construction Projects”, AACE International,Virtual Conference and Expo, Boston, USA.

Montaser, A. and Moselhi, O. (2021) “Control IntegratedData Analysis and Reporting for Construction Projects”, AACE International,Virtual Conference and Expo, Boston, USA.

Bardareha, H. and Moselhi, O. (2020), “Automated DataAcquisition for Indoor Localization and

Tracking ofMaterials Onsite”, Proceedings of the 37th International Symposium onAutomation and Robotics in Construction (ISARC 2020), Japan.

Abdelkader, E., Moselhi, O., Marzouk, M. and Zayed, T.(2020), “Evaluation of Spalling in Bridges Using Machine Vision Method”, Proceedingsof the 37th International Symposium on Automation and Robotics in Construction(ISARC 2020), Japan.   

Hosny, A. H., Nik-Bakht, M. and Moselhi, O. (2019). “Workspace Management on Construction Jobsites: A Critical Reviewof Existing Models”, proceedings of the joint international conference of CSCE construction specialty and ASCEConstruction Research Congress (CRC), Montreal/ Laval, QC.

Bhatia, A., Han, S., Moselhi, O., Leid, Z and Raimondi, C. (2019), “DataAnalytics of Production Cycle Time for Modular Construction Projects”,proceedings of MOC Summit 2019, Banff, Alberta.

Assad, A., Moselhi, O., and Zayed, T. (2019), “Resilience Assessment Frameworkfor Water Distribution Networks.”, Proceedings of the joint internationalconference of CSCE construction specialty and ASCE Construction ResearchCongress (CRC), Montreal/ Laval, QC.

Salem, A., and Moselhi, O. (2019), “Low-cost Smart Productivity Monitoring andControl of Earthmoving Operations”, Proceedings of the joint internationalconference of CSCE construction specialty and ASCE Construction ResearchCongress (CRC), Montreal/ Laval, QC.

Mohamed, B. and Moselhi, O. (2019), “A framework for Utilization of AgileManagement in Construction”, Proceedings of the joint internationalconference of CSCE construction specialty and ASCE Construction ResearchCongress (CRC), Montreal/ Laval, QC.

Abdelkader, E., Moselhi, O.,  Zayed, T. andMarzouk, M. (2019), “Prediction of Concrete Bridge Decks Condition using aMarkov Chain Monte Carlo-Based Methodr”, Proceedings of the jointinternational conference of CSCE construction specialty and ASCE ConstructionResearch Congress (CRC), Montreal/ Laval, QC.

Salama, T.,  Salah, A. and Moselhi, O. (2019), “Integrated scheduling of modular constructionusing   “Mod-Scheduler”, Proceedings of the joint international conference of CSCEconstruction specialty and ASCE Construction Research Congress (CRC),Montreal/ Laval, QC.

Golkhoo, F., Moselhi, O., (2017), “Automated Construction Materials DataAcquisition Using Digital Imaging and RFID”, 6th International ConstructionSpecialty Conference, CSCE, Vancouver, Canada.

Golkhoo, F.,and Moselhi, O., (2016), “Developed Automated Real-Time Construction MaterialsManagement System”, International Conference on Advances in Management,Economics and Entrepreneurship (ICAMEE), Toronto, Canada.

Salama, T., Salah,A., Moselhi, O. (2016). “Configuration of Hybrid Modular Construction forResidential Buildings.” Proceedings of the 7th International Conference onConstruction and Project Management (ICCPM2016), Turku, Finland, and theInternational Journal of Innovation, Management and Technology (IJIMT, ISSN:2010-0248, DOI: 10.18178/IJIMT).

Ahmed,M., Moselhi, O. and Bhwomick, A. (2016) “Integration of NDEMeasurements and Current Practice in Bridge Deterioration Modeling”,proceedings of the 33rd International Symposium on Automation and Roboticsin Construction (ISARC), Auburn, Alabama, USA.

Moselhi O., Salama T.(2015), “Near optimum selection of module configuration for efficient modularconstruction”, Proceedings of the Modular and offsite constructionconference, Edmonton, Alberta.

Elsawah, H., Guerrero, M. and Moselhi, O. (2014), “Decision Support Model forIntegrated Intervention Plans of Municipal Infrastructure”, to be presented atthe ASCE International Conference on Sustainable Infrastructure, LongBeach, California, USA.

Yalda, R. andMoselhi O, "4D-Based Value Engineering" Proceedings of the 2014Construction Research Congress (CRC), Georgia Institute of Technology,Atlanta, GA, USA.

Popic, Z. and Moselhi, O. (2014) “Project Delivery Systems Selectionfor Capital Projects Using the Analytical Hierarchy Process and the AnalyticalNetwork Process” Proceedings of the 2014 Construction Research Congress(CRC), Georgia Institute of Technology, Atlanta, GA, USA.

Adhikari, R.S.,Moselhi, O., and Bagchi, A. (2013), Spectral and Fractal Analysis of DigitalImages for Evaluating Defects in Bridges, IEMCON2013, Science City, Kolkata,India, August 23-24.

Ibrahim, M., Germain, C., Guevremont, M., Forcier, M. and Moselhi,O.  (2013) “Automated Development ofConstruction Schedules Using Onsite Data Acquisition”, The 30thInternational Symposium on Automation and Robotics in Construction (ISARC2013), Montreal, Canada.

Azarm, R. Moselhi, O. and (2013), “Probabilistic Forecasting of ProjectCompletion Date Using Material Status Onsite”, Proceedings of the jointConstruction Research Congress (CRC) and the CSCE International ConstructionSpecialty Conference, Montreal, Canada.

Moselhi, O. (2011), “The use ofEarned Value in Forecasting Project Duration”, Proceedings of the 28thInternational Symposium on Automation and Robotics in Construction, Soul,Korea.

Moselhi. O. and Roofigari,N., (2011), “Using the AnalyticalHierarchy Process in Compressing Schedules of Construction Projects” Proceedings of the 11th InternationalSymposium on Analytical Hierarchy Process, (ISAHP 2011), Sorrento, Naples, Italy.

Paul, U. Moselhi, O and Gocevski, V. (2005)“Vulnerability Assessment of Infrastructure Facilities” Proceedings of the ICOSSAR05,Rome, Italy

Siqueira, I. and Moselhi, O., (1998)"An Integrated Cost Estimating Method for PrefabricatedConstruction", Proceedings of the 26th CSCE Annual Conference, pp.147-156, Halifax, Canada.

Moselhi, O. and Sigurdardottir, V.Y.,(1997) "A Decision Support System for Selecting Trenchless PiplineRehabilitation Techniques", Proceedings of the No-DIG'98 Conference,Albuquerque, New Mexico.

Moselhi, O. and Hason, S.,  (1994) "Computer Simulation of Concrete Slab-on-grade Construction", Proceedingsof the 11th International Symposium on Automation and Robotics inConstruction, (ISARC), pp. 125-132, May, Brighton, U.K..

Moselhi, O., Hason, S. and Fazio,P.,  (1992)  "Balanced Integration of AutomatedEquipment and Robots in Construction Operations", Proceedings of TheCanadian Conference and Exhibition on Industrial Automation, pp.14.13-14.16, June, Montreal, Quebec.

Moselhi, O. and Martinelli, A.,  (1990) "Analysis of Bids Using Multiattribute Utility Theory",Proceedings of the International Symposium on Building Economics andConstruction Management", pp. 335-345, March, Sydney, Australia.

Moselhi, O. and Nicholas, M.,  (1990) "Expert System for Construction Planning and Scheduling - AnIntegrated Approach", Proceedings of the 7th International Symposium onAutomation and Robotics in Construction, pp. 319-326, Bristol, England.

Moselhi, O. and Mamet, J.C.,  (1982) "Stress Concentrations Around the Penetrations in the ContainmentStructure of Nuclear Power Plants", Proceedings of the CSCE AnnualConference, pp. 535-551, May, Edmonton, Alberta.

Moselhi, O., Iordanescu, M. and Mamet,J.C.,  (1981)  "Analysis of Openings in the ReactorBuilding Containment Structure of Nuclear Power Plants", Proceedings ofthe CSCE Annual Conference, pp. 267-280, May, Fredericton, NB.

Moselhi, O. and Mamet, J.C.,  (1980) "Approximate Seismic Analysis Considering Out-of-Plane Behaviour ofStructural Diaphragms", Proceedings of the CSCE Annual Conference,pp. 5.7.1-5.7.8, May, Winnipeg, Manitoba.

Moselhi, O.,  (1979) "Automated Macroelement Technique for the Analysis of Tall BuildingStructures", Proceedings of the CSCE Annual Conference, pp. 49-54,June, Montreal, Quebec.

Moselhi, O., Fazio, P. and Ha, H.K.,  (1979) "Efficient Analysis of Framed Tube Structures", ASCE SpringConvention, Subcommittee on Preliminary and Approximate Methods of Analysis ofTall Buildings, pp. 1-19, April, Boston, MA, Preprint3546.

Moselhi, O.,  (1979) "Analysis of Tall Building Frames by Reducing the Number ofFloors", Proceedings of the International Symposium of Behavior ofBuilding Systems and Building Components, Department of Civil Engineering,Vanderbilt University, March, Nashville, Tennessee.

Moselhi, O.,  (1979) "Orthotropic Macroelement Technique for the Analysis of Core-SupportedStructures", Proceedings of the CSCE Annual Conference, pp.296-300, June, Montreal, Quebec.

Reddy, D.V., Moselhi, O. and Sheha,S.A.E.,  (1977)  "Dynamic Structure-Medium Interaction ofUnderground Nuclear Reactor Containments", Proceedings of the SixthWorld Conference on Earthquake Engineering, January, New Delhi, India.

Reddy, D.V., Moselhi, O. and Sheha,S.A.E., (1976) "Parametric Studies of the Dynamic Response of UndergroundNuclear Reactor Containments", Proceedings of the Fourth U.S. NationalConference on Earthquake Engineering Research (U.C.E.E.R.), June,Vancouver, B.C.

Available: one Postdoctoral Fellow and one Research Associate positions

Available positions in construction engineering and management

Two (2) positions are available for immediate hire in the area of Construction Engineering and Management (CEM):

1.0 Postdoctoral Fellow to work with Prof. O.moselhi, and
2.0 Research Associate to work in the Center for Innovation in Construction and Infrastructure Engineering and Management (CICIEM)

Requirements: hold a PhD or equivalent in CEM, excellent communication skills, and ability to work effectively in a team environment. Knowledge of French is an asset. 

Submit your CV directly to Professor Osama Moselhi via email: osama.moselhi@concordia.ca


Took 38 milliseconds
Back to top

© Concordia University